Fire Fighting Water Pump Station

Project Overview

Fire fighting protecting of a 200 MVA Power Transformer. The need for fire protection necessitated the implementation of this project. They were prepared in advance – electrical wiring and cabinet projects, pump building, delivered and installed two pumps of 120 kilowatts each. According to the requirement not to extinguish a fire under voltage, the automated fire-fighting system was synchronized with the existing relay protections of the 200 MVA Power Transformer. Software development using Mitsubishi GX Works (LD) and PLC MELSEC-F Series.

Services

  • Electrical Cabinet assembly and commissioning.
  • Software development according to desired standard.
  • Adaptation with existing transformers relay protection.